These jobs use the xref:chapter_calendar_events[calendar events] for
defining the schedule.
+Since scheduled backups miss their execution when the host was offline or the
+pvescheduler was disabled during the scheduled time, it is possible to configure
+the behaviour for catching up. By enabling the `Repeat missed` option
+(`repeat-missed` in the config), you can tell the scheduler that it should run
+missed jobs as soon as possible.
+
Backup modes
------------